Solarna Systems / interactive engineering
Solar operations HMI
Follow the energy. Understand the state.
A working simulation of generation, conversion and consumption. Adjust the conditions and see the whole system respond.
Preparing the local simulation. Values are unavailable until initialisation completes.
Power flow overview
From sunlight to site.
Generation & conversion
Two independent PV paths
Each 37.4 kWp array feeds its own 30 kW inverter.
| Source | Available DC kW | Delivered DC kW | Output AC kW |
|---|---|---|---|
| INV-01Unknown | N/A | N/A | N/A |
| INV-02Unknown | N/A | N/A | N/A |
- PV available DC
- N/A kW
- PV delivered DC
- N/A kW
- Unused available DC
- N/A kW
- Active inverter capacity
- N/A kW
Clipping and unavailable inverters reduce delivered power; available sunlight is shown separately.
UnknownPower & stored energy
Every kilowatt accounted for
PV + battery discharge + grid import = served load + battery charge + grid export.
- Unserved demand
- N/A kW
- Battery bus power + discharge / − charge
- Not fitted
- Battery SOC / stored energy
- Not fitted
- PV AC energy since restart
- N/A kWh
- Battery charge / discharge AC energy since restart
- N/A / N/A kWh
- Unserved energy since restart
- N/A kWh
Model charge and discharge efficiency: 95% each. Reserve: 20%. Upper charge limit: 95%. Readings are rounded; balance uses full precision.
UnknownRecent samples
The response over time
Collecting samples. Only elapsed simulated time is recorded.
UnknownOperator awareness
Alarms & events
- No active alarms.
Acknowledgement records awareness. It does not clear an active fault.
Latest events simulated elapsed time
Source identity & quality
A complete total needs every source
Local model SS-CPV-OPS-001 · no accepted sample.
- INV-01 / array 01
- UNAVAILABLE
- INV-02 / array 02
- UNAVAILABLE
- Complete PV AC total
- UNAVAILABLE
- Site demand / grid exchange
- UNAVAILABLE
- Optional battery / converter
- UNAVAILABLE · not fitted
GOODAccepted simulation inputs.
STALELast valid sample held.
BADValidation failed; current value unknown.
UNAVAILABLENo accepted sample or source absent.
Equipment states are simulated, not field-proven. Breaker commands, feedback and isolation are not modeled. Zero displayed or animated power does not prove de-energisation. A known inverter fault may have a GOOD zero-power sample; missing data is never substituted with zero.
Read the model, not just the numbers
Clear assumptions. Clear boundaries.
74.8 kWp, two distinct paths
Two 37.4 kWp arrays and two 30 kW grid-tied inverters. LONGi LR5-72HPH-550M Pmax coefficient: −0.340%/°C at 25 °C STC (LONGi20211101V14). The model assumes 25 °C ambient, 45 °C nominal operating cell temperature, a 0.98 DC factor and 97% inverter efficiency.
No simulated island operation
PV and optional battery are grid-following. Grid loss stops both outputs and leaves demand unserved. The battery model absorbs surplus PV or offsets a shortfall within its power and SOC limits. It is absent from the current PV drawing.
A stale value stays visibly stale
Communications loss freezes the last valid readings and simulation clock, marks the state unknown and stops flow animation. Recovery retains existing equipment faults. All inputs and calculations stay in your browser.
Engineering demonstration only. This process view is not a construction drawing, plant control interface or safety certification.
Discuss a monitoring project